300 MW unit of Tavan-Tolgoi TPP to be put into operation during project's first stage

AKIPRESS.COM - The Tavan-Tolgoi TPP, which will be built on the basis of the Tavan-Tolgoi coal deposit, will be divided into two stages, 300 and 150 MW, and the first stage will be 300 MW, the industry minister of Mongolia stated...